Materialplanering

The exercise was created 15.03.2026 by Ekonomiglosorhb. Anzahl Fragen: 29.




Fragen wählen (29)

Normally, all words in an exercise is used when performing the test and playing the games. You can choose to include only a subset of the words. This setting affects both the regular test, the games, and the printable tests.

All None

  • MRP Material Requirements Planning
  • MRP II Manufacturing Resource Planning
  • ERP Enterprise Resource Planning
  • ERP II intergrerar andra system via webben
  • TOC Theory of constraints
  • APS Advanced Planning and Scheduling
  • APO Advanced Planning and Optimization
  • BOM bill of materials
  • CPFR Collaborative Planning, Forecasting, and Replenishment
  • EDI Electronic Data Interchange
  • ASN Advance shipment notices
  • RCCP Rough cut capacity planning
  • CRP Capacity requirements planning
  • MPS Master production scheduling
  • SOP/SO&P Sales and operations planning
  • SOP steg 1 Uppdatera prognos
  • SOP steg 2 Efterfrågeplanering (hur många lagerplatser)
  • SOP steg 3 Kapacitet, plan vs utfall
  • SOP steg 4 Avstämning (marknad, produktion logistik, upphandling)
  • SOP steg 5 Ledningsmöte med besluttagande kring leverans och prodplan
  • MRP LOOP steg 1 MPS
  • MRP LOOP steg 2 BOM
  • MRP LOOP steg 3 Gross requirements
  • MRP LOOP steg 4 Stock on hand
  • MRP LOOP steg 5 Scheduled receipts
  • MRP LOOP steg 6 net requirements
  • MRP LOOP steg 7 Planned order deliveres
  • MRP LOOP steg 8 Order quantity
  • MRP LOOP steg 9 Planned order start