Materialplanering

The exercise was created 2026-03-16 by Ekonomiglosorhb. Question count: 36.




Select questions (36)

Normally, all words in an exercise is used when performing the test and playing the games. You can choose to include only a subset of the words. This setting affects both the regular test, the games, and the printable tests.

All None

  • MRP material requirements planning
  • MRP II manufacturing Resource Planning
  • ERP Enterprise Resource Planning
  • ERP II intergrerar andra system via webben
  • TOC Theory of constraints
  • APS Advanced Planning and Scheduling
  • APO Advanced Planning and Optimization
  • BOM bill of materials
  • CPFR Collaborative Planning, Forecasting, and Replenishment
  • EDI Electronic Data Interchange
  • ASN Advance shipment notices
  • RCCP Rough cut capacity planning
  • CRP Capacity requirements planning
  • MPS Master production scheduling
  • SOP/SO&P Sales and operations planning
  • SOP steg 1 Uppdatera prognos (antal produkter)
  • SOP steg 2 preliminär leveransplan (säljplan)
  • SOP steg 3 preliminär produktionsplan (kapacitet, man/maskin timmar)
  • SOP steg 4 Avstämning (marknad, produktion logistik, upphandling)
  • SOP steg 5 Ledningsmöte med besluttagande kring leverans och prodplan
  • MRP LOOP steg 1 MPS (input)
  • MRP LOOP steg 2 BOM (input)
  • MRP LOOP steg 3 Gross requirements (input)
  • MRP LOOP steg 4 Stock on hand (input)
  • MRP LOOP steg 5 Scheduled receipts (input)
  • MRP LOOP steg 6 net requirements
  • MRP LOOP steg 7 Planned order deliveres
  • MRP LOOP steg 8 Order quantity (output)
  • MRP LOOP steg 9 Planned order start (output)
  • MRP extra steg Action messages/omplaneringssignaler
  • olika kanban två-binge, enkort, tvåkort
  • Kapacitetsplaneringsmetoder Capacity bill och overall factors
  • RTF Release time fence
  • DTF demand time fence
  • PTF Planning time fence
  • FTF Forecast time fence

All None

Shared exercise

https://spellic.com/eng/exercise/materialplanering.12933416.html